An introduction to the two kinds of drainage connection and the considerations that come with them.
Foul vs surface water
Foul water is wastewater from toilets, kitchens and washing. Surface water is rainwater run-off from roofs and hard surfaces. They are often handled by separate connections.
Connecting to the network
- New connections to the public sewer require an application and approval.
- Foul and surface water may connect to different parts of the network.
- The water and sewerage authority reviews and approves connections.
Build-over and diversions
Building over or close to a public sewer usually requires a build-over agreement. Where a sewer conflicts with your development, a diversion may be needed.
Adoption
New drainage infrastructure may go through an adoption process, where the authority takes on future ownership and maintenance. Requirements vary.
Please note. Drainage requirements are site-specific and set by the relevant water and sewerage authority.
This guide provides general information and is not legal, engineering or regulatory advice. Requirements are confirmed on a project-specific basis. [Company to review and approve content before publication.]