Electricity

New electricity connections for developments of every size

Low- and high-voltage electricity connections coordinated with the relevant DNO or IDNO — from a single property through to large multi-plot developments.

What this service covers

A new electricity connection provides your development with a supply from the local distribution network. It usually involves a load assessment, an application to a Distribution Network Operator (DNO) or Independent Distribution Network Operator (IDNO), a quotation and design, and physical connection works on and around the site.

We manage that process end to end — preparing the application, comparing DNO and IDNO routes where relevant, coordinating metering, and tracking the project through to energisation.

Projects it suits

  • Single properties and self-builds
  • Housing developments and estates
  • Apartment and mixed-use buildings
  • Commercial, retail and hospitality units
  • Industrial and logistics facilities
  • EV charging and renewable schemes

Scope of support

Exact scope depends on our confirmed capabilities and is verified for every project before work begins.

  • New low-voltage and high-voltage connections
  • Single-property and multi-plot developments
  • Load assessments
  • DNO and IDNO applications
  • Metering coordination
  • Service alterations and upgrades
  • Temporary building supplies
  • Disconnections and diversions
  • Energisation coordination
  • EV charging infrastructure where relevant

Information we'll need from you

  • Site location plan and proposed layout
  • Estimated electrical load or maximum demand
  • Supply phase (single or three phase), if known
  • Number of plots or units
  • Target programme and connection date
  • Any existing supply or meter details

How it works

Six clear stages

1

Project review

You share the site address, plans, requirements, expected loads, unit numbers and target programme.

2

Site & capacity assessment

We review the information, identify likely network requirements and confirm any surveys still needed.

3

Applications & quotations

Applications are prepared and submitted to the relevant network operators, utility companies or contractors.

4

Option review

We review the available quotations, routes, programmes, responsibilities and commercial considerations with you.

5

Acceptance & coordination

Once you choose an option, we help coordinate approvals, payments, designs, permits and contractors.

6

Installation & connection

We track the project through installation, metering, commissioning and connection.

Utility timescales vary according to network capacity, permissions, design complexity, third-party works, road-opening requirements and provider availability. Early engagement is strongly recommended.

Good to know

Common challenges

Insufficient network capacity

Where the local network is constrained, reinforcement works may be needed. We identify this early and explain the cost and programme implications.

Unclear load requirements

If loads are not yet defined, we help you scope a sensible estimate so the network can produce an accurate quotation.

Competing DNO/IDNO options

We compare routes on cost, programme and responsibility so the commercial trade-offs are clear.

Jargon, explained

Terminology

DNO
Distribution Network Operator — owns and manages the regional electricity distribution network.
IDNO
Independent Distribution Network Operator — operates networks in competition with the regional DNO, often on new developments.
Load assessment
An estimate of the electrical demand your development will place on the network.
Energisation
The point at which the new connection is made live and electricity can flow.

FAQs

Electricity questions

A DNO is the regional network operator; an IDNO is an independent operator that can adopt and run networks on new developments. An IDNO route can offer commercial or programme advantages, which we help you compare.

For most projects an estimated load helps the network assess capacity and quote accurately. If you are unsure, we can help you scope it.

Yes — we can arrange temporary supplies for site cabins, welfare and plant, and coordinate the move to permanent supplies later.

Related services

Often needed alongside

Need a new electricity connection? Send us your site plan and estimated load requirements.

We'll review the requirements and explain the next steps — no obligation.